Fukushima – 2.16 – Prime Minister Suga (Plant Inspection, 2020)

ECOCIDE
noun
destruction of the natural environment,
especially when deliberate.

FUKUSHIMA NUCLEAR DISASTER


Prime Minister Suga

The Official Story

DISMANTLING OF FUKUSHIMA DAIICHI REACTORS


 

The reactors will take 30–40 years to be decommissioned. On August 1, 2013, the Japanese Industry Minister Toshimitsu Motegi approved the creation of a structure to develop the technologies and processes necessary to dismantle the four reactors damaged in the Fukushima accident.

To reduce the flow of contaminated water into the Pacific Ocean, TEPCO spent ¥34.5 billion (approx. $324 million) to build a 1.5 kilometer-long underground wall of frozen soil around the plant, constructed by Kajima Corporation. 1,500 hundred-foot long, supercooled pipes were inserted into the ground in order to freeze the surrounding groundwater and soil. The wall ultimately failed to significantly decrease the groundwater flowing into the site.

On September 26, 2020, Prime Minister Yoshihide Suga visited the Daiichi Nuclear Power Plant to show that his cabinet prioritized the reconstruction of areas that were affected by natural and nuclear disasters.

Source: Wikipedia

The Truth

FALSE FLAG

A false flag is a covert operation designed to deceive; the deception creates the appearance of a particular party, group, or nation being responsible for some activity, disguising the actual source of responsibility.

Click above for full decode

SUBLIMINAL
adjective

(of a stimulus or mental process) below the threshold of sensation or consciousness; perceived by or affecting someone’s mind without their being aware of it.

HISTORICAL TRUTH

THE TIME IS NOW:

AWAKEN HUMANITY

END RADIOACTIVE
DUMPING

SAVE THE
OCEANS

HOLD THEM ALL ACCOUNTABLE

Comments are closed.